Product Details:
Payment & Shipping Terms:
|
Power (W): | 3500 | Voltage (V): | 380 |
---|---|---|---|
Housing Material: | Stainless Steel | Power Source: | Electricity |
Application: | Stir Frying, Deep Frying, Stewing, Braising, Boiling Chinese Soup | Suitable For: | Restaurant,hotel,school,snack Bar,cafe |
Ceramic Glass Size: | 300*300mm4 | Power(w): | 3500 |
Voltage(v): | 380 | Switch: | Rotary DIL Switches |
Quality: | Top Class For Commercial Kitchen | Service: | OEM And Bespoke |
Material: | Stainless Steel | Product Size: | 1500*550*(800+150)mm |
induction clay pot furnace electric coil hot plate 300+300+300+300mm
Image
|
|||
Name |
Electric Burner Rang
|
Electric Burner Rang
|
Electric Burner Rang
|
Model No |
CH-3.5BZ8
|
CH-3.5BZ6
|
CH-3.5BZH4
|
Power(kw) |
3500
|
3500
|
3500
|
Voltage(v) |
380V/50HZ
|
380V/50HZ
|
380V/50HZ
|
Material |
304# Stainless steel
|
304# Stainless steel
|
304# Stainless steel
|
Dimension(mm) | 1580*800*800/920mm | 1200*800*800/920mm | 800*800*800/920mm |
Detail description:
Installation conditions:
Our company:
Certification:
Our Service:
We service for | OEM, ODM, school, restaruant, hotel, factory, goverment, hospital etc |
After-sales service |
1) Two years guarantee period of the grill ,the first years we afford the shipping and the parts , the second years , we also can afford the parts , but we couldn't afford the shipping . 2) we will send the custom some parts if by 10 pc each type
3) The damage caused in transportation is not covered in guarantee. |
FAQ:
Q. How about the After-sales Service?
A: Except microcrystalline glass, the machine can warranty for two years. About the product quality problem, we can provide the free accessories within two years, but the freight shall be borne by the customer.
Q. How long is the delivery time?
A: 1-3 sets in stock, if there is not enough, we can delivery in 7 days normally.
3-10 sets, we can production completed in 7-10 days.
10-100, 20 days can delivery.
Q. What is the mode of transportation?
A: By express, fast, door to door, and 3-5 days can arrived.
By sea, cheap, about 20-45 days can arrived.
By air, fast, but need take delivery by yourself, about 3-5 days can arrived.